What is transit oriented development TOD?

What is transit oriented development TOD? is an article that defines it in academic and practice, and who invented it. The article shows the (when) reason to go to this type of development and when. In addition,  it shows why the private sector or public sector approaches this type of development and what benefits it brings. Also, showing some examples from practice.

Transit-oriented development: definition.

TOD is the strategy and approach of urban design and development to locate the development near mass transit stations to encourage inhabitants to use them and to reduce car use and reduce its negative impact on society, economy, and environment. See Figure 1, a link to transit TOD project in Romania.

What is transit oriented development TOD? The railway station strip façade side of the urban regeneration of the Sopot railway station
Figure 1, The railway station strip façade side of the urban regeneration of the Sopot railway station.

Who invented TOD strategy and approach?

The term transit-oriented development was first coined by Peter Calthorpe and the formal framework in his book in 1993. The next American Metropolis ecology, community, and the American Dream. The developers and investors used this strategy and approach widely in their work. That specifically, in the USA context. Accordingly turned the public and specialist interest, and they studied it. The debate that arose around this strategy led to the formal invention of it, and a framework was built to use it.

When is transit-oriented development used?

Developers and investors in the world look into cost, demand, and opportunities for development and benefits. Some developer, social benefits of society, concerns them, and it’s the driver for development. Developers’ main concern in development is the cost of the development. TOD, due to its direct benefit of reducing the demand for car use and reducing car parks It’s an attraction.

If a development does not require car parks, then the road network and related infrastructure will be minimal. The cost of the development will be reduced heavily and making the development less costly. For that, many parts of the development cost of construction are reduced. That makes the development units affordable and increases the possibility of sales, rent, and usability.

Another factor is demand. Many occasional studies have been published about real estate demands, especially housing. In conjunction with the local plans and government policies for a future location of development, the developers move to initiate projects. Demand represents a driver for starting an urban development. Developers might steady and present other locations for development to fulfill the demand in the market.

Developers might occasionally look for opportunities for development and benefits. For example, a derelict agricultural land, and the cost of solving its problems does not cover the benefit of production. Or the land includes a continuous problem that makes it unusable. Another example, an industrial former area including deprived industries. These industries are dead in the market. Also, an owner who needs cash or funds for any reason might put his land for sale.

In these three examples, a developer will find an opportunity for land purchase at an affordable cost. A chance to fulfill the market demand for housing and other types of development. The affordable land price, proper location in the city, and fulfilling the market demand for a need drive the initiation of a development. In this manner, the developer can bargain with the authorities for development approvals to reach success.

Why transit-oriented development?

It is crucial to highlight the benefits are the use of transit a transit-oriented development strategy in transport planning. But before that, I need to highlight the concept of transit transport node in planning. The Transit Transport node is developed by a public body transport planning agency or a joint venture private sectors. It is developed for specific areas where an assessment of its need was conducted earlier. On top of the list is the population it serves and their availability in the area.

The transport transit node will define areas for further development. It increases access to the area for the majority of the community. This access creates several benefits. The increase in demand for housing in the area at all levels of property values. Also, the transport node increased property values and land prices. Finally, Several businesses will flourish nearby because of increased access. For example, restaurants, cafes, retail commercial stores, medical services, and businesses that provide services for the community.

It’s not the way around that transit-oriented development creates transit nodes. The location of the transit node and the benefits and needs it creates encourage this type of development. TOD also creates several benefits for the community. On top of the benefits is increasing the efficiency and benefits of public mass transit. It encourages the government to develop the transit in the area due to the increase in cash generated by the use of the public transit station.

In this way, the government will require less funding to develop the infrastructure and make the public transit network bigger and less costly. There is one major contradiction to the importance of TOD. Regardless of all the benefits it provides. Since it’s transit-oriented and transit nodes increase property and land prices when developed. Also, The Major factor and attraction for development is its cost, as mentioned earlier.

Accordingly, for many who do not have experience in urban development, land price is a major factor for developers to decide to start the development. For example, I worked on a mega development ( four towers in the Emirates). The developer purchased the land for 250 million DHS. The tower, a ground plus 30-story, estimated construction cost was 350 million DHS. And this development was not a transit-oriented development.

In this practice example, the land price comprises 40% of the total development cost. If this development were TOD, the land price would have been higher. And this is one of the contradictions of TOD in relation to its efficiency. TOD is not always a good strategy and approach for sustainable urban development.

Developing Sydney transport system

TOD provides several benefits. On top of these benefits, achieving one of the requirements of sustainable urban development and green architecture. The decrease in car use and encouragement to use the public mass transit system, in addition to the following. Economic benefits like increasing and achieving economies of scale. The reduction of required public funds for building and developing a public transit network.

Social benefits include that TOD makes very high social cohesion. It’s a tool to provide social welfare and freedom of choice in living? And encourage democratic practice (vote). Environmental benefits include all sustainable urban development benefits of the environmental pillar. From the planning control and rules view, it creates changes. By locating a transit station in an area, the land use changes gradually to mixed-use to make the change affordable.

Transit-oriented development also encourages various businesses, Start as retail and commercial services, including grocery stores, household goods, laundry, saloon, dentist, restaurants, and others. This also creates changes to land uses and planning control and rules. Another benefit is learning from practice. Studying Tod projects represents a laboratory offering useful lessons for planners and developers.

In these developments, some things were working, while others were not. So the Interested party should steady them to make things work properly somewhere else.

The ten case studies from worldwide practice for TOD projects

I have compiled 10 case studies from practice with all its data showing the economic benefit of transit-oriented development. the ten developments come from worldwide projects. The indicated benefits as shown in the text below details of project benefit for criteria A, B, C.

The info graph in figure 2 shows all the data in an interactive way for all the criteria A, B, C specified for each project.

TOD case study projects economic benefits info graph

Below are ten cases, each with the same fields (model, key statistics, headline metric, caveat).

  • A: property premium or uplift (%)
  • B: value capture or public revenue (money)
  • C: development growth (people, jobs, floor space)

1. Hong Kong: MTR “Rail plus Property” (Asia)

  • Model: the government grants the MTR land development rights along its lines to compensate for the cost of building the railway. scmp
  • 2024: net profit was HK$15.77bn, up from HK$7.78bn in 2023, and local property development profit was HK$10.26bn. That is roughly 65% of net profit (my calculation). rthk
  • Scale: 271 km of line and 99 stations. prosper
  • Headline metric (B): property development share of net profit.
  • Caveat: property profits are lumpy. They depend on site completions and the property cycle.

2. Tokyo: Tokyu Corporation, Den-en-toshi Line (Asia)

  • Profit mix, FY2004–16: real estate was about 36% of operating profit (about ¥321bn), transport about 40%, and retail, leisure and hotels about 24%. ppiaf
  • Corridor: the garden-city districts cover about 50 km² and 600,000 residents. ppiaf
  • Futako-tamagawa redevelopment: 11.2 ha, completed in 2015. Floor-area sales of ¥100.1bn were supplemented by ¥36.6bn of public subsidy. All but 12 of 1,033 apartments in phase one had sold by 2012. ppiaf
  • Headline metric (B): real estate’s share of operating profit (36%), with ¥100.1bn of floor-area sales against ¥36.6bn of public subsidy.
  • Caveat: it took about 15 years, and Tokyu owned over 95% of the property rights around the station.

3. Singapore: MRT Downtown Line 2 (Asia)

  • Staged effect on HDB resale prices: +1.9% at announcement (within 1 km), a further +3% during construction, and +7% at opening. Flats within 1.5 km saw +2.8% at opening. homeanddecor
  • Cross-section: about an 8% resale premium within 500 m of a station. propertyguru
  • Headline metric (A): +7% within 1 km at opening.
  • Caveat: in 11 of 26 HDB towns, one analysis found no price correlation with MRT proximity. Some of these figures come from industry or media summaries of the studies, so verify against the primary papers. propertynet

4. Delhi/Gurugram: Delhi Metro extension (Asia)

  • Premium: properties within 500 m of a station saw 20–25% price growth after the project. ijcua
  • Timing: about half of the premium appeared during planning and construction, and half after operations began. ijcua
  • Sample: 300 residential properties, 2007–2024. ijcua
  • Headline metric (A): 20–25% growth within 500 m.
  • Caveat: the sample is small and covers plotted residential land. It is also a single corridor in a fast-growing market.

5. Dubai: Metro Red Line (Middle East)

  • Sales: properties within a 15-minute walk of a Red Line station rose 26.7% (Q1 2010–Q4 2022), against 24.1% for Dubai overall. cbre
  • Rents: +5.7% within 15 minutes (Q1 2018–Q4 2022), against −4.1% citywide. By area: City Walk 55.4%, Downtown 49.7%, Business Bay 20.8%, Marina 15.1%. cbre
  • Sample: over 300 properties, plus about 112,000 rental contracts. dubaieye1038cbre
  • Headline metric (A): a 1.6-point sales outperformance and a 9.8-point rental gap (my calculation from the CBRE figures above).
  • Caveat: the sales premium is modest. An earlier analysis found no clear price effect in parts of Dubai Marina, where building quality explained the differences. meed

6. London: Elizabeth Line / Crossrail (Europe)

  • Uplift: £20.1bn total property value uplift in the Crossrail-commissioned study, and £10.6bn within 1 km of stations by 2021. crossrailapm
  • Density: new housing within 500 m of stations was about 50% denser than elsewhere. progress
  • Cost and capture: of £18.8bn in cost, the Business Rate Supplement raised about £4.2bn and the Community Infrastructure Levy about £300m. progress
  • Headline metric (B/A): £20.1bn uplift against £18.8bn cost, with about £4.5bn captured.
  • Caveat: the uplift figures are estimates. Savills found only about a third of stations had outperformed the local market since construction began, which was before full service started. savills

7. Copenhagen: Ørestad and the Metro (Europe)

  • Growth: about 100 residents in 2004, now over 26,000 residents, about 25,000 jobs and 22,000 students. cphpost
  • Financing model: land sales and government-backed debt paid for the metro. By 2016 no other public funds had been used. Daily ridership was about 150,000 in 2013. gihub
  • Headline metric (C): 100 to 26,000 residents in about 20 years.
  • Caveat: the financing was contested. Danish auditors criticised the company’s revenue assumptions, and payback was stretched to 2073. This case is better evidence for growth than for a proven financial return. dknyt

8. Arlington, Virginia: Rosslyn-Ballston corridor (North America)

  • Tax base: 7.6% of the county’s land produced 33% of its real estate tax revenue by 2010. arlingtonhistorical
  • Premium: new offices within 500 ft of a station earn a 30% premium over those a quarter-mile away, and apartments 23%. planitmetro
  • Behaviour: at corridor stations 75% of boardings arrive on foot, against 15% at conventional Fairfax stations. cnu
  • Growth: population within a quarter-mile of stations rose nearly 107% between 1990 and 2000. arlingtonva
  • Regional context: property taxes around Washington-area Metro stations bring in $3.1bn a year, from land that is 1.2% of the metro area. planitmetro
  • Headline metric (B): 7.6% of land yielding 33% of tax revenue.

9. Dallas: DART light rail (North America)

  • Value gap within ¼ mile of stations versus control areas: office +80%, single-family +52%, retail +24%, industrial +17%. dart
  • New development value, 1993–2013: over $1.5bn near stations against roughly $600m in control areas. progressiverailroading
  • Tax contribution: $36.3m a year against $14.2m. dart
  • Cumulative: $17.1bn of aggregate property value increase near stations since 1999, against a $5.5bn cost for the 93-mile system. railwayageunt
  • Headline metric (A/B): office +80% and a 2.5-fold tax contribution.
  • Caveat: control areas are matched along the nearest major road. This is a comparison, not proof of causation.

10. Bogotá: TransMilenio BRT (Latin America)

  • Rent effect: each extra 5 minutes of walking to a station lowers rent by 6.8–9.3%, an elasticity of −0.16 to −0.22. berkeley
  • Distribution: middle-income homes were valued more when closer to the system, while low-income housing showed the opposite. worldtransitresearch
  • Headline metric (A): a 6.8–9.3% rent penalty per 5 minutes of walking.
  • Caveat: the cross-sectional design means the effect cannot be attributed directly to the BRT, and the data covers 2000–2004. It is useful as a bus-based counterpoint and for the equity angle. berkeley

Enjoyed this article? Our author book Experience: What Matters in Architecture, Urban Design and Planning shares his experience in professional practice. Read about the book or find it on Amazon.